Nacero Selects Bechtel for Development of Energy Transition Infrastructure Facility in the Permian
Nacero has awarded Bechtel the Front-End Engineering and Design (FEED) contract for the first natural gas-to-gasoline manufacturing facility in the United States.
Comentários